Thursday, September 11, 2025

After years of space struggles, Laoag school gains room to grow

- Advertisement -spot_img

Few would expect that a top-performing school like Buttong Integrated School (BuIS) in Laoag City has long struggled with space and facility limitations.

Originally built to serve elementary students, the school was thrust into a new role in 2022 when it was converted into an integrated school, accommodating learners up to Grade 10. While the conversion was welcomed by the community, it slowly showed challenges.

With no proper classrooms for junior high school (JHS), the school resorted to makeshift solutions. Some classes were held in the covered court and others in the conference hall.

“When I was installed here as principal in January, my biggest challenge was that we had incoming Grade 10 students but no classrooms for them. The existing classrooms were designed for elementary pupils, not for JHS students,” BuIS Principal Arnel Sabuco said.

“Learning was difficult under those conditions. The spaces weren’t conducive. It wasn’t ideal, but we always open our school to everyone. We did what we could to keep them in school,” he added.

Sabuco calls the turnover of the new SM Foundation two-story, four-classroom school building a ‘sigh of relief.’ The foundation, in partnership with SM Prime and in support of the Department of Education’s Adopt-A-School program, constructed fully furnished classrooms with key features designed for comfort, functionality, and safety.

Each classroom is equipped with panoramic whiteboards, wall-mounted fans, clocks, and armchairs, including left-handed chairs. Every room has its own comfort room, an upgrade from shared restrooms in older buildings.

The structure also includes a PWD-accessible restroom, emergency lighting, a fire alarm bells, and ramps for accessibility.

“This building came at the right time. It will allow us to give students and teachers a better environment for teaching and learning. Now, we can focus on improving quality, not just making space,” the principal smiled.

With over 30 teachers and about 1,000 students, the new building helps ease the school’s overcrowding problem and gives breathing room for future growth.

With renewed facilities, the school community is optimistic about the new doors that will open for them.

“To the Buttong community, let’s continue working together. We will do our best to make this school something we can all be proud of. With the new school building, we will keep our goal of ensuring a more seamless and high-quality transfer of learning, now that we have more conducive classrooms for effective teaching and learning,” the principal hoped.

Author

- Advertisement -

Share post: